Sunday, August 6, 2017

What is soil stabilization ?

Soil stabilization is a method of improving soil properties by blending and mixing other materials.


Following are the various soil stabilization methods and materials:

1. Soil Stabilization with Cement:

The soil stabilized with cement is known as soil cement. The cementing action is believed to be the result of chemical reactions of cement with siliceous soil during hydration reaction. The important factors affecting the soil-cement are nature of soil content, conditions of mixing, compaction, curing and admixtures used.

The appropriate amounts of cement needed for different types of soils may be as follows:

Gravels – 5 to 10%Sands – 7 to 12%Silts – 12 to 15%, andClays – 12 – 20%

The quantity of cement for a compressive strength of 25 to 30 kg/cm² should normally be sufficient for tropical climate for soil stabilization.

If the layer of soil having surface area of A (m²), thickness H (cm) and dry density rd (tonnes/m3), has to be stabilized with p percentage of cement by weight on the basis of dry soil, cement mixture will be and, the amount of cement required for soil stabilization is given by Amount of cement required, in tonnes =

Lime, calcium chloride, sodium carbonate, sodium sulphate and fly ash are some of the additives commonly used with cement for cement stabilization of soil.

2. Soil Stabilization using Lime:

Slaked lime is very effective in treating heavy plastic clayey soils. Lime may be used alone or in combination with cement, bitumen or fly ash. Sandy soils can also be stabilized with these combinations. Lime has been mainly used for stabilizing the road bases and the subgrade.

Lime changes the nature of the adsorbed layer and provides pozzolanic action. Plasticity index of highly plastic soils are reduced by the addition of lime with soil. There is an increase in the optimum water content and a decrease in the maximum compacted density and he strength and durability of soil increases.

Normally 2 to 8% of lime may be required for coarse grained soils and 5 to 8% of lime may be required for plastic soils. The amount of fly ash as admixture may vary from 8 to 20% of the weight of the soil.

3. Soil Stabilization with Bitumen:

Asphalts and tars are bituminous materials which are used for stabilization of soil, generally for pavement construction. Bituminous materials when added to a soil, it imparts both cohesion and reduced water absorption. Depending upon the above actions and the nature of soils, bitumen stabilization is classified in following four types:

Sand bitumen stabilizationSoil Bitumen stabilizationWater proofed mechanical stabilization, andOiled earth.

4. Chemical Stabilization of Soil:

Calcium chloride being hygroscopic and deliquescent is used as a water retentive additive in mechanically stabilized soil bases and surfacing. The vapor pressure gets lowered, surface tension increases and rate of evaporation decreases. The freezing point of pure water gets lowered and it results in prevention or reduction of frost heave.

The depressing the electric double layer, the salt reduces the water pick up and thus the loss of strength of fine grained soils. Calcium chloride acts as a soil flocculent and facilitates compaction. Frequent application of calcium chloride may be necessary to make up for the loss of chemical by leaching action. For the salt to be effective, the relative humidity of the atmosphere should be above 30%.

Sodium chloride is the other chemical that can be used for this purpose with a stabilizing action similar to that of calcium chloride.

Sodium silicate is yet another chemical used for this purpose in combination with other chemicals such as calcium chloride, polymers, chrome lignin, alkyl chlorosilanes, siliconites, amines and quarternary ammonium salts, sodium hexametaphosphate, phosphoric acid combined with a wetting agent.

5. Electrical Stabilization of Clayey Soils:

Electrical stabilization of clayey soils is done by method known as electro-osmosis. This is an expensive method of soil stabilization and is mainly used for drainage of cohesive soils.

6. Soil Stabilization by Grouting:

In this method, stabilizers are introduced by injection into the soil. This method is not useful for clayey soils because of their low permeability. This is a costly method for soil stabilization.

This method is suitable for stabilizing buried zones of relatively limited extent. The grouting techniques can be classified as following:

Clay groutingChemical groutingChrome lignin groutingPolymer grouting, andBituminous grouting

7. Soil Stabilization by Geotextiles and Fabrics:

Geotextiles are porous fabrics made of synthetic materials such as polyethylene, polyester, nylons and polyvinyl chloride. Woven, non-woven and grid form varieties of geotextiles are available. Geotextiles have a high strength. When properly embedded in soil, it contributes to its stability. It is used in the construction of unpaved roads over soft soils.

Reinforcing the soil for stabilization by metallic strips into it and providing an anchor or tie back to restrain a facing skin element.

What is Analysis of Rates or Rate Analysis of Civil Works?


What is Analysis of Rates or Rate Analysis of Civil Works?

Every construction project is divided into number of activities. Each activity consists of different types of civil or construction works. For example, the in the construction of a building, the activities can be excavation or earthwork, Concrete work, masonry work, Wood work such as doors and windows, plumbing, flooring, waterproofing, finishing work such as plastering, painting or distempering.

The Activity earthwork can be divided into many types based on depth and type of soil. For example, an excavation of 1.5m deep in soft soil, an excavation of 3m deep in hard soil. Likewise, concrete work can be divided into many types based on its mix proportions and its placement. For example, M25 reinforced concrete work in foundation, M30 reinforced concrete work in columns, slabs etc. Likewise, there can be many small civil works in every construction project.

The cost of any construction project is calculated based on each works associated with every construction activity. Thus it is essential to calculate cost of each small works.

Rate analysis of Civil Works or Building Works is the determination of cost of each construction work per unit quantity. This cost includes the cost of materials, labours, machinery, contractors profit and other miscellaneous petty expenses required for the particular work to be complete in unit quantity. For example, cost of 1 cubic meter of M20 RCC work in slab, Cost of 1 cubic meter of excavation in soft soil of 1.5m depth, cost of 1 square meter of plastering of 20mm, cost of 1 square meter of painting work with specified paint in 2 layers or 3 layers as required.

The cost of materials in rate analysis is calculated as combination of cost of material at origin, its transportation costs, taxes. The rate of labour is based on skill of the labour, such as skilled labour, semi-skilled and unskilled labour. The cost of materials and labours vary from place to place. Thus, the cost of each construction work varies from place to place.

What are the factors affecting Analysis of Rates of Civil Works?

Factors which affect the rate analysis of civil works are:

Specification of the civil work and materials such as quality of materials, proportion of mortar or concrete, thickness of plastering, number of coats of painting, depth of excavation, type of soil etc.Location of the construction site – Distance of construction site from source of materials, availability of labours, availability of water, machinery etc. influence the rate analysis of construction work.Quantity of materials, number of different types of labours and rates of materials and labours influence the rate analysis.Profit of the contractor, miscellaneous expenses and other overheads also influence the rate analysis.

What are the elements of Rate Analysis of Civil Works?

Elements which constitute the rate analysis are:

a) Material cost inclusive of wastage
b) Labour cost
c) Plant & machinery owning and operating charges
d) Water charges
e) Taxes
f) Insurance/ risk coverage charges
g) Contractor’s overheads and profit

Why Analysis of rates is required in construction projects?

The rate analysis may be required in construction projects for following purposes:

For the purpose of tendering. In the case of tendering, the contractor may calculate cost of unit work involved in each construction activity for justified quoting of rates. The client may also require rate analysis to calculate the cost of construction project.To assess the requirements of quantities of labours, materials, machineries and capital to complete the project.To optimise the use of labour, materials and machineries and to know the alternatives to optimize the resources.To assess the rate of unit work from time to time for payment increase in material or labour costs or any deviations in work specifications, extra items of work to the contractor.To compare the cost of project with the sanctioned capital of the project to take necessary action or regularization of excess or less cost.To workout the budget of the construction project and control the cash flows at various stages of construction work.To find out the irrational rates quoted by the contractors during tendering process.To serve as the basic data in case of dispute among project owner and contractor.

10 Things to remember during Concrete Mix Design.

10 Things to remember during 
Concrete Mix Design.

Good quality concrete starts with the quality of materials, cost effective designs is actually a by-product of selecting the best quality material and good construction practices. Following are 10 Things to remember during Concrete Mix Design and Concrete Trials.

1. ACI and other standards only serves as a guide, initial designs must be confirmed by laboratory trial and plant trial, adjustments on the design shall be done during trial mixes. Initial design “on paper” is never the final design.

2. Always carry out trial mixes using the materials for actual use.

3. Carry out 2 or 3 design variations for every design target.

4. Consider always the factor of safety, (1.125, 1.2, 1.25, 1.3 X target strength)

5. Before proceeding to plant trials, always confirm the source of materials to be the same as the one used in the laboratory trials.

6. Check calibration of batching plant.

7. Carry out full tests of fresh concrete at the batching plant, specially the air content and yield which is very important in commercial batching plants.

8. Correct quality control procedures at the plant will prevent future concrete problems.

9. Follow admixture recommendations from your supplier (of course Sika)

10. Check and verify strength development, most critical stage is the 3 and 7 days strength.

Important note:

Technical knowledge is an advantage for batching plant staff, even if you have good concrete design but uncommon or wrong procedures are practiced it will eventually result to failures.

Types of foundation failure

Types of foundation failure :

Types of foundation failure depend on the load it is subjected to. A foundation can fail in three different ways under loads and they are:


1) Punching shear failure of foundation 
2) One-way shear failure of foundation
3) Flexure failure of foundation.


The above three modes of foundation failure should be checked during design stage of concrete foundation for the given load. Guidelines provided by standard codes of practice should be followed so that foundation does not fail in any of the failure types as mentioned under any possible load combinations when structure is occupied.

Types of foundation failure are discussed in detail below:

1) Punching shear failure of foundation:

Punching shear failure is also known as diagonal tension failure of foundation. In this mode of failure, foundation fails due to formation of inclined cracks around the perimeter of the column.

The critical section for punching shear failure is taken at d/2 from the face of the column, where d is the effective depth of footing.

To avoid punching shear failure, the ultimate upward shear force at this section in the foundation should be less than the shear resistance of concrete for the given percentage of concrete. Additional reinforcement should be provided to resist punching shear in case of shear resistance of concrete with reinforcement provided is not sufficient.

The failure of foundation in this mode appears as truncated cone or pyramid around the column, stanchion or pier as shown in figure below:


2) One Way shear failure of foundation:

Foundations in one-way shear failure fails in inclined cracks across full width of the footing that intercept the bottom of the footing slab at a distance d from the face of the column (called critical section), where d is the effective depth of footing slab.

In case where steel base plate is used under column directly on the footing slab, the distance d is measured from a line halfway between the face of column and the edge of the base plate.

To avoid one-way shear failure of foundations, the shear stress at the critical section of footing should be less than the shear strength of concrete with given percentage of reinforcement used.

One way shear failure of footing is shown in figure below:


3) Flexure failure of foundations:

During design of footing, Mu/bd2 is calculated to get the percentage of reinforcement for the moment the foundation is exposed to. Mu is the ultimate or factored moment; b is the width of footing. The critical section for flexure is considered at distance d from the face of footing. The standard codes takes care of flexure failure during design by providing percentage of reinforcement required to resist the bending moment. But in case, when bending moment increases in footings, then footing will fails as shown in figure below:

Monday, July 31, 2017

WHAT ARE THE CAUSES OF BUILDING?

WHAT ARE THE CAUSES OF BUILDING? 

The following factors can be defined as the most common reasons causes building collapse:


1. Overload… Too many people on a balcony or deck is a common reason for collapse of such structures or when the occupancy of areas are changed without an evaluation.

2. Lack of maintenance… A lack of maintenance will lead to things like not noticing a problem before it becomes catastrophic.

3. Use of inferior materials/chemicals… Such as older (1960s - 1980s) fire retardant treated wood roof assemblies made with cheap ammonium phosphate are prone to collapse after 25 years of service.

4. Bad engineering… Structural engineers make mistakes, everyone does, but in small firms a lack of multiple people checking designs can lead to bad calculations and structural failures.

5. Under-designed… Don’t confuse this with bad engineering, under-designed means you followed the code correctly and performed good calculations but it still was inadequate for the loads.

6. Fire… Fire reduces steel yield strengths, causes concrete to undergo chemical changes that weaken it, causes masonry to spall/crack and will consume wood materials… All of which can result in collapse.

7. Bad construction… The most common reason for an attached and self-supported deck to collapse is the contractor only provided nails between the deck ledger and the structure of the house, resulting in the deck pulling away.

8. Impact damage… Such as someone driving a car into a house, which can result in partial collapses.

9. Storm damage… Winds generally dont result in a collapse as things are lifted away and not falling downwards, but floods can cause buildings/bridges to collapse.

10. Soils… Development of a sinkhole (man made or natural) can obviously cause a building/bridge to collapse.

11. Seismic… Earthquakes can make just about anything collapse if it is not designed for the magnitude of accelerations occurring.

Thursday, July 27, 2017

WHAT IS THE MEANING OF SOIL REINFORCEMENT?

WHAT IS THE MEANING OF SOIL REINFORCEMENT? 
(JOB INTERVIEW QUESTION) 

Reinforcement of Soil can generally be subdivided into 2 categories: 
A-Reinforced Soils
B-In-situ Reinforcement. The latter is often termed “soil nailing”. 


Soil Reinforcement may be made with a number of materials:
1. Woven Geotextiles
2. Polymer Geogrids of Polyethylene (usually uniaxial) & polypropylene (usually biaxial)
3. Polyester and Fiberglass Geogrids (often knitted or stitched at junctions) and usually coated with a polymer such as polyethylene or PVC or with bitumen.
4. Steel Strips (the original “Reinforced EarthTM”) 
5. Welded wire mesh 


Soil nailing technique:
Soil nailing is an in-situ reinforcement technique, was originally introduced in France in the 1970s. It can be described as an in-situ reinforcing of soil using an array of nails installed as passive inclusions in a grid. The construction begins with the excavation of a shallow cut (Fig) on the face of which wire mesh is laid followed by applying shotcrete to the face. When the latter is set, soil nails are drilled through the shotcrete and grouted, followed by 9 anchoring them to the wall. The sequence is repeated until the final depth is reached. The nail being rigid, unlike the reinforcing strip in reinforced earth, can resist some bending and shear in addition to axial tension. An innovative step is the use of screw nails which are installed by rotation (like screw piles), giving rise to enhanced friction at the soil-nail interface. (This is akin to increased bond in the case of deformed reinforcement bars.)

Soil nailing cannot replace all other methods of soil retention technically or economically. Notwithstanding the same, it has the following advantages:
1. It is not dependent on heavy equipment
2. It is economical where the geometry of the wall is complex and where space restrictions exist
3. Since nails are of low strength steel, the need for corrosion protection stands reduced
4. Construction can be carried out with little disturbance to the environment in terms of noise and vibration


Soil nailing is not practical in:
- Soft, plastic clays
- Organics/Peat
- Fills (rubble, cinder, ash, etc.)

WHAT ARE THE ADVANTAGES OF PRESTRESSED CONCRETE OVER R.C.C ?

WHAT ARE THE ADVANTAGES OF PRESTRESSED CONCRETE OVER R.C.C?
(JOB INTERVIEW QUESTION)
Concrete weak in tension and strong in compression. Therefore, Reinforcement concrete system has been created to overcome the weakness of concrete with rapidly development in construction, the concrete technology has to walk parallel with this development. Therefore, the Prestressed concrete was created to overcome the limit of reinforcement concrete span.
Prestressed concrete is a concrete construction material which is placed under compression prior to it supporting any applied loads or defined as Structural concrete in which internal stresses have been introduced to reduce potential tensile stresses in the concrete resulting from loads
The prestressing of concrete has several advantages as compared to traditional reinforced concrete without prestressing. A fully prestressed concrete member is usually subjected to compression during service life. 
This rectifies several deficiencies of concrete.
Serviceability and Strength

1-Reduces occurrence of cracks .
2-Freezing & thawing durability is higher than non prestressed concrete
3-Section remains uncracked under service loads
4-Reduction of steel corrosion
5-Increase in durability.
6-Full section is utilized
7-Higher moment of inertia (higher stiffness)
Less deformations (improved serviceability).
8-Increase in shear capacity.
9-Improved performance (resilience) under dynamic and fatigue loading.
10-In areas where there are expansive clays or soils with low bearing capacity, post-tensioned slabs-on-ground and mat foundations reduce problems with cracking and differential settlement.
11-Reduces self weight of building thereby reducing the lateral load resisting system. 12-Suitable for use in pressure vessels, liquid retaining structures.
Application

1-High span-to-depth ratios
2-They do not crack under working loads, and whatever cracks may be developed under overloads will be closed as soon as the load is removed, owing to the cambering effect of pre-stress.
3-This becomes an important consideration for such structures as long cantilevers. Under live loads the def section is also smaller because of the effectiveness of the entire un-cracked concrete section.
4-Larger spans possible with prestressing (bridges, buildings with large column-free spaces)
5-Post-tensioning allows bridges to be built to very demanding geometry requirements, including complex curves, and significant grade changes.
6-Another advantage of post-tensioning is that beams and slabs can be continuous, i.e. a single beam can run continuously from one end of the building to the other.
7-Crack control helps in constructing high performance water tanks
8-More aesthetic appeal due to slender sections
9-Applications of various prestressed techniques enable quick assembly of standard units such as bridge members,building frames, bridge decks providing cost-time savings
Economy

1-Rapid construction
2-Better quality control
3-Reduced maintenance
4-Suitable for repetitive construction
5-Multiple use of formwork
6-There is also a definite savings stirrups, since shear in post-tensioned concrete is reduced in the inclination of the tendons, and the diagonal tension is further minimized bathe presence of pre-stress.
7-A lower building height can also translate to considerable savings in mechanical systems and façade costs.
8-Thinner slabs mean less concrete is required. It means a lower overall building height for the same floor-to-floor height.
9-Pre-tensioning is suitable for precast members produced in bulk.
10-The high tensile strength & precision of placement gives maximum efficiency in size & weight of structural members.

Friday, July 21, 2017

HOW TO IMPROVE BEARING CAPACITY OF SOIL? (JOB INTERVIEW QUESTION)

HOW TO IMPROVE BEARING CAPACITY OF SOIL? 
(JOB INTERVIEW QUESTION)

The following techniques can be used for improving bearing capacity of soil as per the site condition:
-Increasing depth of foundation
-Draining the soil
-Compacting the soil
-Confining the soil
-Replacing the poor soil
-Using grouting material
-Stabilizing the soil with chemicals


1. INCREASING DEPTH OF FOUNDATION
At deeper depths, the over burden pressure on soil is higher; hence the soil is more compacted at deeper depth. As a result it shows higher bearing capacity. This is applicable only for cohesionless soils such as sandy and gravelly soils. This method of improving bearing capacity of soil is not applicable if the subsoil material grows wetter as depth increase. This method has a limited use because with increase in depth, the weight and cost of foundation also increases.

2. DRAINING THE SOIL
With increase in percentage of water content in soil, the bearing capacity decreases. In case of sandy soil, the bearing capacity may reduce as much as 50% due to presence of water content. Cohesionless soils (i.e. sandy & gravelly soils) can be drained by laying the porous pipes to a gentle slope, over a bed of sand and filling the trenches above the pipes with loose boulders. These trenches subsequently should lead to the nearest well or any water body.

3. COMPACTING THE SOIL
If we compact soil using appropriate method, then there will be increase in its density and shear strength. As a result the bearing capacity of soil also increases. There are many methods of compacting soils on site. Few of them are mentioned below.:
--By spreading broken stones, gravel or sand and thereafter ramming well in the bed of trenches.
--Using an appropriate roller as per the soil type to move at a specified speed.
--Br driving concrete piles or wood piles and withdrawing piles and subsequently filling the holes with sand or concrete.

4. CONFINING THE SOIL
In this method, the soils are enclosed with the help of sheet piles. This confined soil is further compacted to get more strength. This method is applicable for shallow foundations.

5. REPLACING THE POOR SOIL
In this method the poor soil is first removed and then the gap is filled up by superior material such as sand, stone, gravel or any other hard material. In order to do this, first excavate a foundation trench of about 1.5 m deep, and then fill the hard material is stages of 30 cm. Then compact the hard material at every stage. This method is useful for foundations in black cotton soils.

6. USING GROUTING MATERIAL
This method is applicable for soils where there is presence of pores, fissures or cracks etc underneath the foundation. In this method, poor soil bearing strata is hardened by injecting the cement grout under pressure, because it scales off any cracks or pores or fissures etc. For proper distribution of the cement grout, the ground is bored and perforated pipes are introduced to force the grout.

7. STABILIZING THE SOIL WITH CHEMICALS
This method of improving bearing capacity of soil is costly and applied in exceptional cases. In this method, chemical solutions, like silicates of soda and calcium chloride is injected with pressure into the soil. These chemical along with the soil particles form a gel like structure and develop a compact mass.This is called chemical stabilization of soil and used to give additional strength to soft soils at deeper depths.

Thursday, July 20, 2017

WHAT ARE THE VARIOUS METHODS OF CONCRETE CURING ( JOB INTERVIEW )?



What are the various methods of concrete curing?
(Job interview)

This is also one of the most important question asked in Civil Engineering Job Interview.

For this Question. Provide the definition of Concrete curing and point out the major steps and explain each of them in short. Please Check the explaination below.

Curing is the process of maintaining the moisture and temperature conditions for freshly deployed concrete. This is done for small duration of time to allow the hardening of concrete.


The various methods involved in the concrete curing process are as follows:

•Water curing
a) Sprinkling Method :- Shading concrete work than sprinkling of water on concreted surface. Used for ( Walls , Beams & Columns ). In General, walls, and columns can be cured by sprinkling water.

b) Ponding Method :- the horizontal surfaces including the slab and floors can be cured by stagnating the water.

c) Applying the chemical membrane on concreted surface.

d) Wet covering of surface: It can be cured by using the surface with wet gunny bags or straw

e) Curing Compounds: Easy to apply and inexpensive. Sprayer needed; inadequate coverage allows drying out; film can be broken or tracked off before curing is completed; unless pig- mented, can allow concrete to get too hot.

•Application of heat
a) Steam curing at ordinary pressure
b) Steam curing at high pressure
c) Curing by Infra-red radiation
d) Electrical curing.

Monday, July 17, 2017

What are Daily Activities of Civil Site Engineering at Construction Site?


What are Daily Activities of Civil Site Engineering at Construction Site?

The daily activities of civil site engineers at the construction site are as following:

1. A shift at site starts with the safety talk, where a site engineer alerts the workmen regarding the importance of safety in construction and insists on avoiding unsafe acts.

2. Engage manpower (Supervisors, labours, helpers etc) at different locations such that the productivity of work increases.

3. Then, Safety permits are issued to the concerned workmen for any hot work, work at height etc.. after inspecting the checklist along with safety officer at site.

4. Any lapses on the part of Safety needs to be addressed on an immediate basis.

5. Calculate the quantities (concrete, shutter and other materials) required to cast the structural members as per the site plan and execute the same by the end of the day.

6. Make a note of material availability and inform the same to the store in-charge (in advance) if there is any material shortage.

7. Prepare Bar Bending Schedule (BBS) for the required structural members.

8. Study & understand the drawings and make necessary changes in the soft copy (AutoCAD) as suggested by the manager and get the approval changes by the client.

8. Prepare monthly consumption (material, fuel, manpower etc) report and daily progress reports which will be helpful in finding the monthly turnover.

9. At the end of the day, the activities carried out in the shift needs to be reported in the daily progress report.

There are many other roles but these are 
the main roles of a fresh site engineer.

Sunday, July 16, 2017

Design of Steel Structures


This book introduces the design concept of Eurocode 3 for steel structures in building construction, and their practical application. Following a discussion of the basis of design, including the limit state approach, the material standards and their use are detailed. The fundamentals of structural analysis and modeling are presented, followed by the design criteria and approaches for various types of structural members. The following chapters expand on the principles and applications of elastic and plastic design, each exemplified by the step-by-step design calculation of a braced steel-framed building and an industrial building, respectively. Besides providing the necessary theoretical concepts for a good understanding, this manual intends to be a supporting tool for the use of practicing engineers. In order of this purpose, throughout the book, numerous worked examples are provided, concerning the analysis of steel structures and the design of elements under several types of actions. These examples will provide for a smooth transition from earlier national codes to the Eurocode.



Password : th3civilengineer

Steel Design (5th Edition)

Steel Design (5th Edition) by William T Segui

STEEL DESIGN covers the fundamentals of structural steel design with an emphasis on the design of members and their connections, rather than the integrated design of buildings. The book is designed so that instructors can easily teach LRFD, ASD, or both, time-permitting. The application of fundamental principles is encouraged for design procedures as well as for practical design, but a theoretical approach is also provided to enhance student development. While the book is intended for junior-and senior-level engineering students, some of the later chapters can be used in graduate courses and practicing engineers will find this text to be an essential reference tool for reviewing current practices


Pre-Engineered Buildings (PEB)

Pre-engineered buildings are buildings that are built in factories and are made of steel that are shipped to site and bolted together. PEB (Pre-engineered Building) revolution the construction market using built up sections in place of conventional hot rolled sections. A large column free area is the utmost requirement for any type of industry which is provided by PEB.

Typical Pre-engineered Building

PEB concept involves the steel building systems which are pre designed and prefabricated. As the name itself indicates, there is involvement of pre engineering of structural elements. The basis of PEB is to provide the section at the specified location only according to the need at that spot. The sections may differ along the length according to the bending moment diagram. The use of optimal least section leads to the effective saving of steel and also reduction in the cost.

Various systems of PEB – Pre-Engineered Buildings:

Primary system:

This system involves tapered or parallel columns or tapered beams which are called rafters. Base of column is either fixed or pinned based on the load requirements.

Secondary system:

It consists of purlins, grits which are the side claddings and eave struts stiffened by sag rods. This system also includes the flange stiffeners which joins the untied flanges of the PEB primary system to the secondary system.

Wind bracing system:

Rod bracing and the portal system are the two types of wind bracing systems. Each one is chosen accordingly depending on design and functional requirement.

Accessories:

This part includes the Turbo ventilator, ridge vents, Flashings, gutters, down pipes, ladders etc.


Advantages of PEB – Pre-Engineered Buildings:

  • Construction time: PEB reduces the total construction cost by the least 40% which leads to faster occupancy and early revenue.
  • Lower cost: Saving is accomplished in design, manufacturing and erection cost.
  • Large clear span: In PEB the buildings can be given up to 90m clear spans which is the important advantage of PEB with column free space.
  • Flexibility of expansion: PEB can be easily expanded in length by adding additional bays.
  • Quality control: PEB’s are manufactured under controlled conditions depending on the site and hence the quality is assured.
  • Low maintenance: PEB’s have high quality paint systems for cladding which gives long durability and low maintenance costs.
Pre-engineered Building Under Construction

Applications of Pre-Engineered Buildings – PEB:

Some of the many applications of PEB are:
  • Factories, Warehouses, Workshops, Offices
  • Gas stations
  • Showrooms
  • Aircraft hangers
  • Metro stations
  • Vehicle parking sheds
  • Schools, Indoor stadium roofs
  • Bridges, Railway platform shelters
  • Outdoor stadium canopies

PEB are more advantageous than the conventional structures in economy, speed of construction and simple erection. As these structures have a wide scope, they must be preferred and utilized.

PEB Assembly

Video below shows step by step assembly of a Pre engineered structure.